Make-Buy, Outsourcing & Network Design worked example

Supplier Switching Cost at 47% share of parts requiring full requalification: a worked example in make-buy, outsourcing & network design

This worked example runs the supplier switching cost numbers for a tougher week than the baseline: 47% share of parts requiring full requalification instead of the typical 65%. Estimates the one-time cost of moving parts to a new supplier including per-part requalification, the share needing full approval, and bridge inventory during cutover.

The inputs for this scenario

  • Part numbers requalified at new supplier: 120 part numbers (held at the documented default)
  • Requalification cost per part number: 850 $/part number (held at the documented default)
  • Share of parts requiring full requalification: 47 % (the input this scenario stresses; the baseline uses 65)
  • Dual-running and safety-stock buffer cost: 60,000 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Switching cost = part numbers x requalification cost x full-qual share + buffer cost.
  • Total supplier switching cost works out to 107,940 $ at these inputs, and this is the headline figure for the scenario.
  • Supplier switching cost per unit works out to 900 $ / piece at these inputs.
  • Variable supplier switching cost works out to 47,940 $ at these inputs.
  • Fixed supplier switching cost adder works out to 60,000 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where share of parts requiring full requalification sits at 65% and the headline result is 126,300 $, this scenario comes in 14.54% below the baseline at 107,940 $.
  • Use it when comparing a new supplier's quote against an incumbent, or when consolidating spend, to size the one-time cost of changing sources. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Total supplier switching cost: 107,940 $ (headline result)
  • Supplier switching cost per unit: 900 $ / piece
  • Variable supplier switching cost: 47,940 $
  • Fixed supplier switching cost adder: 60,000 $