Manufacturing Master Data & Data Governance worked example
ERP Data Quality Score with erp data defect severity rating of 15 score: a worked example
This scenario runs the erp data quality score calculation on the strong side: erp data defect severity rating of 15 score, with every other input held at its documented default. Use it when erp data quality in manufacturing master data and data governance needs a defensible ranking against other manufacturing master data and data governance risks for the next review.
The inputs for this scenario
- ERP data defect severity rating: 15 score (raised for this scenario; the documented default is 6)
- ERP data defect occurrence rating: 4 score (unchanged)
- ERP data defect detection rating: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (ERP data quality risk score = ERP data quality severity score × ERP data quality occurrence score × ERP data quality detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for erp data quality risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for erp data quality severity score.
- At this operating point the engine returns 4 score for erp data quality occurrence score.
- At this operating point the engine returns 3 score for erp data quality detection score.
How this compares with the baseline
- Against the tool's baseline example, where erp data defect severity rating sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it when triaging an ERP data-quality backlog, running a data-governance FMEA, or prioritizing remediation before a system upgrade. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- ERP data quality risk score: 8.15 score (headline result)
- ERP data quality severity score: 15 score
- ERP data quality occurrence score: 4 score
- ERP data quality detection score: 3 score
Run it with your numbers
- Every input above is editable in the live ERP Data Quality Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.