Manufacturing Master Data & Data Governance worked example
Routing Accuracy Score with routing error severity rating of 15 score: a worked example
This scenario runs the routing accuracy score calculation on the strong side: routing error severity rating of 15 score, with every other input held at its documented default. Use it when routing accuracy in manufacturing master data and data governance needs a defensible ranking against other manufacturing master data and data governance risks for the next review.
The inputs for this scenario
- Routing error severity rating: 15 score (raised for this scenario; the documented default is 6)
- Routing error occurrence rating: 4 score (unchanged)
- Routing error detection rating: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Routing accuracy risk score = routing accuracy severity score × routing accuracy occurrence score × routing accuracy detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for routing accuracy risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for routing accuracy severity score.
- At this operating point the engine returns 4 score for routing accuracy occurrence score.
- At this operating point the engine returns 3 score for routing accuracy detection score.
How this compares with the baseline
- Against the tool's baseline example, where routing error severity rating sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it during a routing FMEA, a master-data audit, or when triaging which routing defects to correct first. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Routing accuracy risk score: 8.15 score (headline result)
- Routing accuracy severity score: 15 score
- Routing accuracy occurrence score: 4 score
- Routing accuracy detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Routing Accuracy Score calculator, which recalculates instantly and can be shared with the inputs intact.