Mass Finishing, Deburring & Polishing worked example
Quote Price at 92% recoverable share of quoted rate: a worked example in mass finishing, deburring & polishing
Push recoverable share of quoted rate up to 92% and the picture changes. This example computes every intermediate figure at that operating point. Use it when quote price in mass finishing, deburring and polishing is being put through a mass finishing, deburring and polishing weighted-cost review.
The inputs for this scenario
- Parts in the quoted finishing order: 100 units (unchanged)
- Quoted finishing price rate per part: 45 $ / unit (unchanged)
- Recoverable share of quoted rate: 92 % (raised for this scenario; the documented default is 80)
- Fixed setup and tooling charge: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Quote Price cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where recoverable share of quoted rate sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- It computes a total quote as quantity times price rate times recoverable share plus a fixed charge, then divides by quantity for the per-piece price. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Quote Price calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.