Mass Finishing, Deburring & Polishing worked example
Unload Labor Time at 92% manual handling share of unload: a worked example
This scenario runs the unload labor time calculation on the strong side: 92% manual handling share of unload, with every other input held at its documented default. Use it when unload labor time in mass finishing, deburring and polishing is being put through a mass finishing, deburring and polishing weighted-cost review.
The inputs for this scenario
- Parts unloaded in the batch: 100 units (unchanged)
- Unload labor cost per part: 45 $ / unit (unchanged)
- Manual handling share of unload: 92 % (raised for this scenario; the documented default is 80)
- Fixed setup and cleanup cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Unload Labor Time cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 hr for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where manual handling share of unload sits at 80% and the headline result is 3,850 hr, this scenario comes in 14.03% above the baseline at 4,390 hr.
- Use it when quoting a finishing job or analyzing where labor goes in a finishing cell that relies on manual unload and inspection. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Weighted cost: 4,390 hr (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Unload Labor Time calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.