Mass Finishing, Deburring & Polishing worked example

Water Usage at 61% water recovery and flow efficiency: a worked example

This worked example runs the water usage numbers for a tougher week than the baseline: 61% water recovery and flow efficiency instead of the typical 85%. Calculate water usage for mass finishing, deburring & polishing planning, quoting, troubleshooting, capacity review, or process improvement.

The inputs for this scenario

  • Parts finished per run: 500 units (held at the documented default)
  • Process water per part: 0.08 units (held at the documented default)
  • Water recovery / flow efficiency: 61 % (the input this scenario stresses; the baseline uses 85)

Working through the calculation

  • The calculation starts from the formula this tool documents: Required water usage = covered amount × use per unit ÷ transfer efficiency.
  • Required quantity works out to 65.57 units at these inputs, and this is the headline figure for the scenario.
  • Theoretical amount works out to 40 units at these inputs.
  • Loss allowance works out to 25.57 units at these inputs.
  • Efficiency works out to 61 % at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where water recovery and flow efficiency sits at 85% and the headline result is 47.06 units, this scenario comes in 39.34% above the baseline at 65.57 units.
  • Use it to size makeup water and compound, plan effluent treatment capacity, or evaluate a water-recovery upgrade. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Required quantity: 65.57 units (headline result)
  • Theoretical amount: 40 units
  • Loss allowance: 25.57 units
  • Efficiency: 61 %

Run it with your numbers

  • To rerun this with your own numbers, open the live Water Usage calculator, set water recovery and flow efficiency to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.