Measurement, Test & Control Equipment worked example
Enclosure Machining Cost at 86% custom machining scope: a worked example
What does the result look like when custom machining scope reaches 86%? The full calculation is worked below with real intermediate numbers. Use when quoting custom enclosures for test stations, budgeting control panel builds, or comparing fabricated vs. off-the-shelf NEMA/IP-rated enclosures for instrumentation.
The inputs for this scenario
- Number of instrument enclosures: 24 enclosures (unchanged)
- Machining cost per enclosure: 185 $ / enclosure (unchanged)
- Custom machining scope (share requiring cutouts): 86 % (raised for this scenario; the documented default is 75)
- Tooling and NRE cost: 1,200 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable machining cost = number of enclosures x machining cost per enclosure x custom machining scope / 100) to the inputs above produces each figure below.
- At this operating point the engine returns 5,018 $ for total enclosure machining cost, the number this scenario is built around.
- At this operating point the engine returns 209 $ / piece for effective cost per enclosure.
- At this operating point the engine returns 3,818 $ for variable machining cost.
- At this operating point the engine returns 1,200 $ for tooling and nre cost.
How this compares with the baseline
- Against the tool's baseline example, where custom machining scope sits at 75% and the headline result is 4,530 $, this scenario comes in 10.78% above the baseline at 5,018 $.
- A figure at this level is achievable when custom machining scope is genuinely sustained, not just peaked for a shift. A single custom-scope percentage blends simple and complex panels, so a run with a few heavily-machined enclosures and many light ones may be mis-estimated unless you split them.
Results at a glance
- Total enclosure machining cost: 5,018 $ (headline result)
- Effective cost per enclosure: 209 $ / piece
- Variable machining cost: 3,818 $
- Tooling and NRE cost: 1,200 $
Run it with your numbers
- Every input above is editable in the live Enclosure Machining Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.