MedTech Manufacturing worked example
Incoming Lot Release Time at 18% documentation and disposition allowance: a worked example
This worked example runs the incoming lot release time numbers for a tougher week than the baseline: 18% documentation and disposition allowance instead of the typical 25%. Estimate time to complete incoming material/component lot release including inspection, testing, and documentation.
The inputs for this scenario
- Inspection and test points per lot: 20 points (held at the documented default)
- Points completed per minute: 0.5 points / min (held at the documented default)
- Documentation and disposition allowance: 18 % (the input this scenario stresses; the baseline uses 25)
Working through the calculation
- The calculation starts from the formula this tool documents: Base incoming lot release time = inspection points รท points completed per minute.
- Total lot release time works out to 47.2 min at these inputs, and this is the headline figure for the scenario.
- Base inspection and testing time works out to 40 min at these inputs.
- Documentation and disposition time added works out to 18 % at these inputs.
- QC processing rate works out to 0.5 pieces / min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where documentation and disposition allowance sits at 25% and the headline result is 50 min, this scenario comes in 5.6% below the baseline at 47.2 min.
- Use it when planning incoming inspection capacity, setting dock-to-stock lead time, or balancing inspection headcount against receiving volume. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total lot release time: 47.2 min (headline result)
- Base inspection and testing time: 40 min
- Documentation and disposition time added: 18 %
- QC processing rate: 0.5 pieces / min
Run it with your numbers
- To rerun this with your own numbers, open the live Incoming Lot Release Time calculator, set documentation and disposition allowance to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.