MedTech Manufacturing worked example
Lot Traceability Cost at 98% traceability completeness rate: a worked example
This scenario runs the lot traceability cost calculation on the strong side: 98% traceability completeness rate, with every other input held at its documented default. Use this when justifying ERP/MES traceability module investments, estimating cost of increasing lot granularity, or budgeting traceability compliance resources.
The inputs for this scenario
- Active production lots per period: 48 lots (unchanged)
- Documentation cost per lot: 125 $ / lot (unchanged)
- Traceability completeness rate: 98 % (raised for this scenario; the documented default is 85)
- Fixed traceability system cost: 2,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable lot traceability cost = active lots × documentation cost per lot × traceability completeness rate) to the inputs above produces each figure below.
- At this operating point the engine returns 7,880 $ for total lot traceability cost, the number this scenario is built around.
- At this operating point the engine returns 164 $ / piece for traceability cost per lot.
- At this operating point the engine returns 5,880 $ for variable documentation cost.
- At this operating point the engine returns 2,000 $ for fixed traceability system cost.
How this compares with the baseline
- Against the tool's baseline example, where traceability completeness rate sits at 85% and the headline result is 7,100 $, this scenario comes in 10.99% above the baseline at 7,880 $.
- Use it when budgeting quality operations, building a business case for traceability software, or pricing the compliance overhead of a production program. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total lot traceability cost: 7,880 $ (headline result)
- Traceability cost per lot: 164 $ / piece
- Variable documentation cost: 5,880 $
- Fixed traceability system cost: 2,000 $
Run it with your numbers
- Every input above is editable in the live Lot Traceability Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.