Sterilization Cycle Time at 14% loading and documentation allowance: a worked example
This worked example runs the sterilization cycle time numbers for a tougher week than the baseline: 14% loading and documentation allowance instead of the typical 20%. Estimate total sterilization cycle time including preconditioning, exposure, aeration/cooling, and post-cycle handling.
The inputs for this scenario
- Sterilization process steps: 5 steps (held at the documented default)
- Steps completed per hour: 0.4 steps / hr (held at the documented default)
- Loading and documentation allowance: 14 % (the input this scenario stresses; the baseline uses 20)
Working through the calculation
- The calculation starts from the formula this tool documents: Base sterilization cycle time = sterilization process steps รท steps completed per hour.
- Total sterilization cycle time works out to 14.25 hr at these inputs, and this is the headline figure for the scenario.
- Process time (no handling) works out to 12.5 hr at these inputs.
- Loading and documentation time added works out to 14 % at these inputs.
- Steps completed per hour works out to 0.4 pieces / min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where loading and documentation allowance sits at 20% and the headline result is 15 hr, this scenario comes in 5% below the baseline at 14.25 hr.
- Use it when planning sterilizer scheduling, estimating batch release lead time, or sizing how many cycles a sterilizer can run per day. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total sterilization cycle time: 14.25 hr (headline result)
- Process time (no handling): 12.5 hr
- Loading and documentation time added: 14 %
- Steps completed per hour: 0.4 pieces / min