Metal Recycling, Scrap Processing & Salvage worked example
Yard Inventory Turns with yard inventory turns daily usage of 3,000 units / day: a worked example
What does the result look like when yard inventory turns daily usage reaches 3,000 units / day? The full calculation is worked below with real intermediate numbers. Use it when yard inventory turns in metal recycling, scrap processing and salvage is being sized for a buffer or safety stock review.
The inputs for this scenario
- Yard inventory turns daily usage: 3,000 units / day (raised for this scenario; the documented default is 1,200)
- Yard inventory turns lead time: 85 days (unchanged)
- Yard inventory turns safety stock: 1.1 units (unchanged)
Working through the calculation
- Applying the documented formula (Yard inventory turns cycle stock = yard inventory turns daily usage × yard inventory turns lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 32.09 days for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 35.29 days for unprotected days.
- At this operating point the engine returns 3,000 pieces for inventory.
- At this operating point the engine returns 85 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where yard inventory turns daily usage sits at 1,200 units / day and the headline result is 12.83 days, this scenario comes in 150% above the baseline at 32.09 days.
- A figure at this level is achievable when yard inventory turns daily usage is genuinely sustained, not just peaked for a shift. It assumes steady daily usage and a fixed lead time — real scrap inflows and processing rates swing, so treat the days-of-supply figure as a planning baseline, not a guarantee against a supply shock.
Results at a glance
- Protected days of supply: 32.09 days (headline result)
- Unprotected days: 35.29 days
- Inventory: 3,000 pieces
- Daily usage: 85 pieces / day
Run it with your numbers
- Every input above is editable in the live Yard Inventory Turns calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.