Metals, Steel, Aluminum & Coil Processing worked example
Coil Storage Cost at 110% billable share of inventory: a worked example
Push billable share of inventory up to 110% and the picture changes. This example computes every intermediate figure at that operating point. Use it when a service center manager prices warehouse or toll storage and needs the carrying cost of coils held over time.
The inputs for this scenario
- Coil-months in storage: 120 coil-months (unchanged)
- Warehouse rate per coil-month: 8 $ / coil-month (unchanged)
- Billable share of inventory: 110 % (raised for this scenario; the documented default is 100)
- Fixed handling and crane cost: 200 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable storage cost = coil-months stored × storage rate × billable share) to the inputs above produces each figure below.
- At this operating point the engine returns 1,256 $ for total storage cost, the number this scenario is built around.
- At this operating point the engine returns 10.47 $ / piece for cost per coil-month.
- At this operating point the engine returns 1,056 $ for variable storage cost.
- At this operating point the engine returns 200 $ for fixed handling cost.
How this compares with the baseline
- Against the tool's baseline example, where billable share of inventory sits at 100% and the headline result is 1,160 $, this scenario comes in 8.28% above the baseline at 1,256 $.
- It multiplies coil-months by the storage rate and billable share for the variable cost, then adds fixed handling to give a total storage cost. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total storage cost: 1,256 $ (headline result)
- Cost per coil-month: 10.47 $ / piece
- Variable storage cost: 1,056 $
- Fixed handling cost: 200 $
Run it with your numbers
- Every input above is editable in the live Coil Storage Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.