Microgrid & Distributed Energy Equipment worked example
Grid Interconnect Review Load with connected test load of 6 kW: a worked example
This worked example runs the grid interconnect review load numbers for a tougher week than the baseline: connected test load of 6 kW instead of the typical 12 kW. Estimate the electricity used and cost during grid interconnection witness testing and grid-tie review of microgrid and distributed energy equipment, so teams can budget test energy, compare anti-islanding test setups, or include it in the quote.
The inputs for this scenario
- Connected test load: 6 kW (the input this scenario stresses; the baseline uses 12)
- Witness test runtime: 8 hr (held at the documented default)
- Blended electricity rate: 0.12 $ / kWh (held at the documented default)
- Interconnection points reviewed: 1,000 points (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Total interconnection review energy cost = connected test load × witness test runtime × blended electricity rate.
- Interconnection review energy used works out to 48 kWh at these inputs, and this is the headline figure for the scenario.
- Total interconnection review energy cost works out to 5.76 $ at these inputs.
- Energy cost per interconnection point works out to 0.01 $ / piece at these inputs.
- Hourly interconnection review energy cost works out to 0.72 $ / hr at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where connected test load sits at 12 kW and the headline result is 96 kWh, this scenario comes in 50% below the baseline at 48 kWh.
- Use it when planning or invoicing IEEE 1547 witness testing, protection-relay verification, or PCC commissioning where a known test load is energized for a measured duration. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Interconnection review energy used: 48 kWh (headline result)
- Total interconnection review energy cost: 5.76 $
- Energy cost per interconnection point: 0.01 $ / piece
- Hourly interconnection review energy cost: 0.72 $ / hr