Microgrid & Distributed Energy Equipment worked example
Microgrid Capacity Gap at 65% asset availability: a worked example
Suppose asset availability falls to 65%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimate the usable energy a microgrid can deliver across dispatch intervals, after availability and round-trip efficiency, so resilience planners can compare it against peak load and see the capacity gap.
The inputs for this scenario
- Usable energy delivered per dispatch interval: 4 kWh / interval (held at the documented default)
- Number of available dispatch intervals: 480 intervals (held at the documented default)
- Asset availability: 65 % (the input this scenario stresses; the baseline uses 90)
- Battery round-trip efficiency: 97 % (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Gross microgrid capacity = usable energy per dispatch interval × available dispatch intervals.
- Deliverable microgrid capacity works out to 1,211 kWh at these inputs, and this is the headline figure for the scenario.
- Gross microgrid capacity works out to 1,920 kWh at these inputs.
- Availability loss works out to 672 kWh at these inputs.
- Round-trip efficiency loss works out to 37.44 kWh at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where asset availability sits at 90% and the headline result is 1,676 kWh, this scenario comes in 27.78% below the baseline at 1,211 kWh.
- It computes gross dispatchable energy, then derates it by asset availability and round-trip efficiency to return deliverable capacity in kWh and the losses that create the gap. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Deliverable microgrid capacity: 1,211 kWh (headline result)
- Gross microgrid capacity: 1,920 kWh
- Availability loss: 672 kWh
- Round-trip efficiency loss: 37.44 kWh
Run it with your numbers
- To rerun this with your own numbers, open the live Microgrid Capacity Gap calculator, set asset availability to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.