Microgrid & Distributed Energy Equipment worked example
Warranty Reserve at 92% expected claim rate: a worked example in microgrid & distributed energy equipment
What does the result look like when expected claim rate reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when warranty reserve on a microgrid and distributed energy fleet needs a defensible number for pricing or financial reporting.
The inputs for this scenario
- Units under warranty: 100 units (unchanged)
- Warranty cost per unit: 45 $ / unit (unchanged)
- Expected claim rate: 92 % (raised for this scenario; the documented default is 80)
- Fixed program reserve: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable warranty reserve = units under warranty × warranty cost per unit × expected claim rate) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total warranty reserve, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for warranty reserve per unit.
- At this operating point the engine returns 4,140 $ for variable warranty reserve.
- At this operating point the engine returns 250 $ for fixed program reserve.
How this compares with the baseline
- Against the tool's baseline example, where expected claim rate sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when expected claim rate is genuinely sustained, not just peaked for a shift. It assumes one blended claim rate and cost per unit; real DER fleets have failure curves that rise with thermal cycling and firmware age, so revisit the rate as field data lands.
Results at a glance
- Total warranty reserve: 4,390 $ (headline result)
- Warranty reserve per unit: 43.9 $ / piece
- Variable warranty reserve: 4,140 $
- Fixed program reserve: 250 $
Run it with your numbers
- Every input above is editable in the live Warranty Reserve calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.