Mining Vehicle & Underground Equipment worked example
Drivetrain Assembly Hours at 12% setup, handling, and delay allowance: a worked example
What does the result look like when setup, handling, and delay allowance reaches 12%? The full calculation is worked below with real intermediate numbers. Use it when drivetrain assembly hours in mining vehicle and underground equipment needs a defensible run time before a quote goes out.
The inputs for this scenario
- Drivetrain units to assemble: 120 units (unchanged)
- Assembly throughput rate: 12 units / min (unchanged)
- Setup, handling, and delay allowance: 12 % (raised for this scenario; the documented default is 10)
Working through the calculation
- Applying the documented formula (Base drivetrain assembly hours time = drivetrain assembly hours workload รท drivetrain assembly hours completion rate) to the inputs above produces each figure below.
- At this operating point the engine returns 11.2 hr for required drivetrain assembly hours time, the number this scenario is built around.
- At this operating point the engine returns 10 hr for base drivetrain assembly hours time.
- At this operating point the engine returns 12 % for drivetrain assembly hours allowance applied.
- At this operating point the engine returns 12 pieces / min for drivetrain assembly hours completion rate.
How this compares with the baseline
- Against the tool's baseline example, where setup, handling, and delay allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
- A figure at this level is achievable when setup, handling, and delay allowance is genuinely sustained, not just peaked for a shift. It applies one flat allowance to a single average throughput rate; it does not model learning-curve effects, mixed-model lines, or station bottlenecks where one operation paces the whole cell.
Results at a glance
- Required drivetrain assembly hours time: 11.2 hr (headline result)
- Base drivetrain assembly hours time: 10 hr
- Drivetrain assembly hours allowance applied: 12 %
- Drivetrain assembly hours completion rate: 12 pieces / min
Run it with your numbers
- Every input above is editable in the live Drivetrain Assembly Hours calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.