Mixing, Blending & Industrial Batch Processing worked example
CIP Cost at 98% recovery capture factor: a worked example
Push recovery capture factor up to 98% and the picture changes. This example computes every intermediate figure at that operating point. Use it when planning a product changeover or quoting a campaign and you need a defensible CIP cost per changeover that includes lost batch time.
The inputs for this scenario
- CIP cycles per changeover: 5 cycles (unchanged)
- Utility and chemical cost per cycle: 38 $ / cycle (unchanged)
- Recovery capture factor: 98 % (raised for this scenario; the documented default is 85)
- Lost production fixed cost: 180 $ (unchanged)
Working through the calculation
- Applying the documented formula (CIP cost per changeover = cycles per changeover × utility and chemical cost per cycle × recovery capture factor + lost production fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 366 $ / changeover for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 73.24 $ / piece for per piece value.
- At this operating point the engine returns 186 $ for captured value.
- At this operating point the engine returns 180 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where recovery capture factor sits at 85% and the headline result is 342 $ / changeover, this scenario comes in 7.23% above the baseline at 366 $ / changeover.
- It computes total CIP cost per changeover as cycles times per-cycle utility and chemical cost adjusted by a recovery capture factor, plus a fixed lost-production cost, and returns cost per cycle. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Weighted cost: 366 $ / changeover (headline result)
- Per piece value: 73.24 $ / piece
- Captured value: 186 $
- Fixed adjustment: 180 $
Run it with your numbers
- Every input above is editable in the live CIP Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.