Motors, Generators & Electrification Equipment worked example
Winding Scrap Cost at 92% share charged to this line or period: a worked example
This scenario runs the winding scrap cost calculation on the strong side: 92% share charged to this line or period, with every other input held at its documented default. Use it when winding scrap is going through a weighted-cost review and you need a defensible loss figure for the line or period.
The inputs for this scenario
- Scrapped windings: 100 windings (unchanged)
- Cost per scrapped winding: 45 $ / winding (unchanged)
- Share charged to this line or period: 92 % (raised for this scenario; the documented default is 80)
- Fixed containment cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable winding scrap cost = scrapped windings × cost per scrapped winding × share charged to this line or period) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total winding scrap cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for scrap cost per winding.
- At this operating point the engine returns 4,140 $ for variable winding scrap cost.
- At this operating point the engine returns 250 $ for fixed containment cost.
How this compares with the baseline
- Against the tool's baseline example, where share charged to this line or period sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it when building a yield-improvement business case, allocating scrap to a line or month, or quantifying the cost of a winding defect spike. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total winding scrap cost: 4,390 $ (headline result)
- Scrap cost per winding: 43.9 $ / piece
- Variable winding scrap cost: 4,140 $
- Fixed containment cost: 250 $
Run it with your numbers
- Every input above is editable in the live Winding Scrap Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.