NPI, DFM/DFA & Engineering Change worked example
Design Verification Cost at 61% share of tests in dv scope: a worked example
This worked example runs the design verification cost numbers for a tougher week than the baseline: 61% share of tests in dv scope instead of the typical 85%. Estimate design verification cost from the number of tests, cost per test, the in-scope share, and setup and fixturing cost.
The inputs for this scenario
- Verification tests executed: 24 tests (held at the documented default)
- Cost per verification test: 650 $ / test (held at the documented default)
- Share of tests in DV scope: 61 % (the input this scenario stresses; the baseline uses 85)
- Test setup and fixturing cost: 5,000 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Total design verification cost = verification tests × cost per test × in-scope share + test setup and fixturing.
- Total design verification cost works out to 14,516 $ at these inputs, and this is the headline figure for the scenario.
- Design verification cost per unit works out to 605 $ / piece at these inputs.
- Variable design verification cost works out to 9,516 $ at these inputs.
- Fixed design verification cost adder works out to 5,000 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where share of tests in dv scope sits at 85% and the headline result is 18,260 $, this scenario comes in 20.5% below the baseline at 14,516 $.
- Use it when budgeting a DV test plan at an NPI design-verification gate or comparing in-house versus outsourced test campaigns. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total design verification cost: 14,516 $ (headline result)
- Design verification cost per unit: 605 $ / piece
- Variable design verification cost: 9,516 $
- Fixed design verification cost adder: 5,000 $