NPI, DFM/DFA & Engineering Change worked example

Manufacturability Score with manufacturability defect severity rating of 3 score: a worked example

This worked example runs the manufacturability score numbers for a tougher week than the baseline: manufacturability defect severity rating of 3 score instead of the typical 6 score. Estimate manufacturability for npi, dfm/dfa and engineering change using production-ready inputs so teams can rank risks and decide which issue needs containment, controls, or escalation first.

The inputs for this scenario

  • Manufacturability defect severity rating: 3 score (the input this scenario stresses; the baseline uses 6)
  • Manufacturability defect occurrence likelihood: 4 score (held at the documented default)
  • Manufacturability defect detection difficulty: 3 score (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Manufacturability risk score = manufacturability severity score × manufacturability occurrence score × manufacturability detection score.
  • Manufacturability risk score works out to 3.35 score at these inputs, and this is the headline figure for the scenario.
  • Manufacturability severity score works out to 3 score at these inputs.
  • Manufacturability occurrence score works out to 4 score at these inputs.
  • Manufacturability detection score works out to 3 score at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where manufacturability defect severity rating sits at 6 score and the headline result is 4.55 score, this scenario comes in 26.37% below the baseline at 3.35 score.
  • Use it during DFM reviews to triage which manufacturability concerns get engineering attention before tooling is cut. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Manufacturability risk score: 3.35 score (headline result)
  • Manufacturability severity score: 3 score
  • Manufacturability occurrence score: 4 score
  • Manufacturability detection score: 3 score

Run it with your numbers

  • To rerun this with your own numbers, open the live Manufacturability Score calculator, set manufacturability defect severity rating to your actual value, and adjust the remaining inputs to match your operation.