Nuclear & Critical Infrastructure Manufacturing worked example
Configuration Control Effort at 23% review board and record update allowance: a worked example
This scenario runs the configuration control effort calculation on the strong side: 23% review board and record update allowance, with every other input held at its documented default. Use it when a wave of engineering change notices needs processing and you need an honest estimate of configuration control hours before they back up.
The inputs for this scenario
- Engineering change notices to process: 35 change notices (unchanged)
- Change notices processed per hour: 3 change notices / hr (unchanged)
- Review board and record update allowance: 23 % (raised for this scenario; the documented default is 20)
Working through the calculation
- Applying the documented formula (Base configuration control hours = engineering change notices to process รท change notices processed per hour) to the inputs above produces each figure below.
- At this operating point the engine returns 14.35 hr for required configuration control hours, the number this scenario is built around.
- At this operating point the engine returns 11.67 hr for base configuration control hours.
- At this operating point the engine returns 23 % for review board and record update allowance applied.
- At this operating point the engine returns 3 change notices / hr for change notices processed per hour.
How this compares with the baseline
- Against the tool's baseline example, where review board and record update allowance sits at 20% and the headline result is 14 hr, this scenario comes in 2.5% above the baseline at 14.35 hr.
- Use it when planning CCB staffing, quoting a configuration management scope, or forecasting how long an ECN backlog will take to clear after a design freeze or modification campaign. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Required configuration control hours: 14.35 hr (headline result)
- Base configuration control hours: 11.67 hr
- Review board and record update allowance applied: 23 %
- Change notices processed per hour: 3 change notices / hr
Run it with your numbers
- Every input above is editable in the live Configuration Control Effort calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.