Nutraceuticals & Functional Foods worked example
Ingredient Potency Overfill at 12% potency overage above claim: a worked example
What does the result look like when potency overage above claim reaches 12%? The full calculation is worked below with real intermediate numbers. A formulation or cost team needs to know what the active overage above label claim adds to batch cost when covering assay variation and shelf-life decline.
The inputs for this scenario
- Active ingredient per batch: 12 kg (unchanged)
- Active ingredient cost: 180 $ / kg (unchanged)
- Potency overage above claim: 12 % (raised for this scenario; the documented default is 10)
- Fixed assay and stability cost: 300 $ (unchanged)
Working through the calculation
- Applying the documented formula (Overage material cost = active ingredient per batch × active ingredient cost × potency overage above claim) to the inputs above produces each figure below.
- At this operating point the engine returns 559 $ for total overage cost, the number this scenario is built around.
- At this operating point the engine returns 46.6 $ / kg for overage cost per kg of active.
- At this operating point the engine returns 259 $ for overage material cost.
- At this operating point the engine returns 300 $ for fixed assay and stability cost.
How this compares with the baseline
- Against the tool's baseline example, where potency overage above claim sits at 10% and the headline result is 516 $, this scenario comes in 8.37% above the baseline at 559 $.
- A figure at this level is achievable when potency overage above claim is genuinely sustained, not just peaked for a shift. It assumes a single flat overage percentage and does not model degradation curves, so it will not tell you the minimum scientifically justified overage.
Results at a glance
- Total overage cost: 559 $ (headline result)
- Overage cost per kg of active: 46.6 $ / kg
- Overage material cost: 259 $
- Fixed assay and stability cost: 300 $
Run it with your numbers
- Every input above is editable in the live Ingredient Potency Overfill calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.