Oil, Gas & Energy Equipment Manufacturing worked example
Rental Fleet Refurbishment Cost at 92% share of fleet needing refurbishment: a worked example
This scenario runs the rental fleet refurbishment cost calculation on the strong side: 92% share of fleet needing refurbishment, with every other input held at its documented default. Use it when budgeting a refurbishment cycle for rental or service equipment and you need a defensible cost across the fleet.
The inputs for this scenario
- Units in refurbishment cycle: 100 units (unchanged)
- Refurbishment cost per unit: 45 $ / unit (unchanged)
- Share of fleet needing refurbishment: 92 % (raised for this scenario; the documented default is 80)
- Fixed shop and recertification cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable refurbishment cost = units in refurbishment cycle × refurbishment cost per unit × share of fleet needing refurbishment) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total rental fleet refurbishment cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for refurbishment cost per unit.
- At this operating point the engine returns 4,140 $ for variable refurbishment cost.
- At this operating point the engine returns 250 $ for fixed shop and recertification cost.
How this compares with the baseline
- Against the tool's baseline example, where share of fleet needing refurbishment sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it when budgeting a refurbishment cycle or setting the refurbishment recovery built into rental day-rates. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total rental fleet refurbishment cost: 4,390 $ (headline result)
- Refurbishment cost per unit: 43.9 $ / piece
- Variable refurbishment cost: 4,140 $
- Fixed shop and recertification cost: 250 $
Run it with your numbers
- Every input above is editable in the live Rental Fleet Refurbishment Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.