Construction Products, Windows, Doors & Fenestration calculator

Order Customization Premium Calculator

Use this calculator to price non-standard sizes, colors, grids, hardware, glass options, special jamb depths, project documentation, or dealer-specific requirements.

What this calculator does

  • Estimate custom-order premium from custom openings, premium per opening, applied scope, and engineering adders.
  • deciding whether a custom fenestration order needs an upcharge
  • The result estimates the premium needed to cover custom-order complexity.

Formula used

  • Variable customization premium = custom openings or configured units × custom premium per opening × customization premium scope included
  • Total customization premium = variable customization premium + fixed engineering and order-entry adder

Inputs explained

  • custom openings or configured units: Use the number of windows, doors, lites, or assemblies with non-standard sizes, colors, hardware, glass, grids, or documentation.
  • custom premium per opening: Use price-book adder, engineering estimate, extra labor/material cost, or historical premium needed for similar custom work.
  • customization premium scope included: Use 100% for all custom options or less for selected features, dealer groups, or product lines.
  • fixed engineering and order-entry adder: Include shop drawings, approvals, programming, special purchasing, project management, and order-entry support.

How to use the result

  • Use it to set dealer upcharges, protect margin on one-off configurations, and decide when engineering review should be mandatory.
  • Treat the result as an estimating and planning number until it is checked against the latest drawings, rough-opening schedule, NFRC or test data, supplier quotes, ERP standards, installation conditions, code requirements, breakage history, scrap reports, labor studies, and actual production results for the same product family.

Common questions

  • What is the order customization premium calculator for? Use this calculator to price non-standard sizes, colors, grids, hardware, glass options, special jamb depths, project documentation, or dealer-specific requirements.
  • What information should I enter? Enter custom openings or configured units, custom premium per opening, the included scope percentage, and fixed engineering and order-entry adder using the same quote, product family, opening schedule, shift, or job lot basis.
  • What does the result tell me? The result estimates the premium needed to cover custom-order complexity.
  • When is the result only an estimate? Treat the result as an estimating and planning number until it is checked against the latest drawings, rough-opening schedule, NFRC or test data, supplier quotes, ERP standards, installation conditions, code requirements, breakage history, scrap reports, labor studies, and actual production results for the same product family.

Last reviewed 2026-05-12.