Packaging Automation & End-of-Line Systems worked example
Case Packing Labor Cost at 92% share packed manually: a worked example
What does the result look like when share packed manually reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when you are comparing manual case packing labor against an automated case packer.
The inputs for this scenario
- Cases packed: 100 cases (unchanged)
- Labor cost per case: 45 $ / case (unchanged)
- Share packed manually: 92 % (raised for this scenario; the documented default is 80)
- Fixed supervision and setup cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Variable packing labor cost = cases packed × labor cost per case × share packed manually) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for total case packing labor cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / case for labor cost per case.
- At this operating point the engine returns 4,140 $ for variable packing labor cost.
- At this operating point the engine returns 250 $ for fixed supervision and setup cost.
How this compares with the baseline
- Against the tool's baseline example, where share packed manually sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when share packed manually is genuinely sustained, not just peaked for a shift. It assumes one blended manual labor rate per case; mixed crew skill, learning curves, and case-size differences can move the real per-case rate, so validate against time studies.
Results at a glance
- Total case packing labor cost: 4,390 $ (headline result)
- Labor cost per case: 43.9 $ / case
- Variable packing labor cost: 4,140 $
- Fixed supervision and setup cost: 250 $
Run it with your numbers
- Every input above is editable in the live Case Packing Labor Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.