Packaging Automation & End-of-Line Systems worked example

Packaging Automation OEE at 99% performance: a worked example

This scenario runs the packaging automation oee calculation on the strong side: 99% performance, with every other input held at its documented default. Use it to benchmark line effectiveness and target the biggest loss in Packaging Automation & End-of-Line Systems.

The inputs for this scenario

  • Operating (run) time: 410 min (unchanged)
  • Planned production time: 480 min (unchanged)
  • Performance: 99 % (raised for this scenario; the documented default is 95)
  • Quality (first-pass yield): 98 % (unchanged)

Working through the calculation

  • Applying the documented formula (Availability = operating time รท planned production time) to the inputs above produces each figure below.
  • At this operating point the engine returns 82.87 % for oee, the number this scenario is built around.
  • At this operating point the engine returns 85.42 % for availability.
  • At this operating point the engine returns 99 % for performance.
  • At this operating point the engine returns 98 % for quality.

How this compares with the baseline

  • Against the tool's baseline example, where performance sits at 95% and the headline result is 79.52 %, this scenario comes in 4.21% above the baseline at 82.87 %.
  • Use it for daily line scorecards, comparing shifts or machines, and prioritizing which loss to attack first. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • OEE: 82.87 % (headline result)
  • Availability: 85.42 %
  • Performance: 99 %
  • Quality: 98 %

Run it with your numbers

  • Every input above is editable in the live Packaging Automation OEE calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.