Pharmaceutical, Biotech & GMP Manufacturing worked example
Capsule Filling Capacity at 99% filling yield: a worked example
Push filling yield up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when GMP, QA, QC, validation, manufacturing, or operations teams need a quick planning estimate to plan capsule filling demand, campaign slots, and downstream inspection or packaging capacity.
The inputs for this scenario
- Capsule filling shifts: 4 shifts (unchanged)
- Capsules filled per shift: 480 capsules / shift (unchanged)
- Filling yield: 99 % (raised for this scenario; the documented default is 90)
- QA released yield: 97 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross capacity = Capsule filling shifts × Capsules filled per shift) to the inputs above produces each figure below.
- At this operating point the engine returns 1,844 units for good output capacity, the number this scenario is built around.
- At this operating point the engine returns 1,920 units for gross capsule capacity.
- At this operating point the engine returns 19.2 units for uptime loss.
- At this operating point the engine returns 57.02 units for yield loss.
How this compares with the baseline
- Against the tool's baseline example, where filling yield sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
- It computes releasable capsule output by multiplying shifts by capsules per shift, then scaling by filling yield and QA released yield. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Good output capacity: 1,844 units (headline result)
- Gross capsule capacity: 1,920 units
- Uptime loss: 19.2 units
- Yield loss: 57.02 units
Run it with your numbers
- Every input above is editable in the live Capsule Filling Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.