Plant Utilities worked example
Utility Cost per Unit at 99% share assigned to production: a worked example
Push share assigned to production up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when reviewing utility cost per unit for a utility budget, maintenance priority, capacity check, energy project, or production support plan.
The inputs for this scenario
- Utility billing units: 185,000 units (unchanged)
- Average utility cost: 0.12 $ / unit (unchanged)
- Share assigned to production: 99 % (raised for this scenario; the documented default is 92)
- Demand charge and meter fee adder: 2,400 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total utility production cost = utility billing units × average utility cost × share assigned to production + demand charge and meter fee adder) to the inputs above produces each figure below.
- At this operating point the engine returns 23,462 $ for total utility production cost, the number this scenario is built around.
- At this operating point the engine returns 0.13 $ / item for cost per item or period.
- At this operating point the engine returns 21,062 $ for variable utility production cost.
- At this operating point the engine returns 2,400 $ for fixed utility adder.
How this compares with the baseline
- Against the tool's baseline example, where share assigned to production sits at 92% and the headline result is 21,973 $, this scenario comes in 6.78% above the baseline at 23,462 $.
- It computes total utility cost assigned to production (variable consumption plus fixed demand/meter adders) and divides it across billing units to give cost per item or per period. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total utility production cost: 23,462 $ (headline result)
- Cost per item or period: 0.13 $ / item
- Variable utility production cost: 21,062 $
- Fixed utility adder: 2,400 $
Run it with your numbers
- Every input above is editable in the live Utility Cost per Unit calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.