PLM, BOM & Digital Thread worked example
PLM License Cost per User at 98% active utilization rate: a worked example
This scenario runs the plm license cost per user calculation on the strong side: 98% active utilization rate, with every other input held at its documented default. Use it to right-size your PLM license count by exposing the cost of idle seats.
The inputs for this scenario
- Licensed PLM seats: 120 seats (unchanged)
- Annual list price per seat: 2,400 $/seat/yr (unchanged)
- Active utilization rate: 98 % (raised for this scenario; the documented default is 85)
- Admin and infrastructure cost: 25,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Effective annual cost = seats x price per seat x utilization rate + admin overhead) to the inputs above produces each figure below.
- At this operating point the engine returns 307,240 $ for total plm license cost per user cost, the number this scenario is built around.
- At this operating point the engine returns 2,560 $ / piece for plm license cost per user cost per unit.
- At this operating point the engine returns 282,240 $ for variable plm license cost per user cost.
- At this operating point the engine returns 25,000 $ for fixed plm license cost per user adder.
How this compares with the baseline
- Against the tool's baseline example, where active utilization rate sits at 85% and the headline result is 269,800 $, this scenario comes in 13.88% above the baseline at 307,240 $.
- Use it before a license renewal, during a seat-count true-up, or when building the business case to reclaim or add PLM seats. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total plm license cost per user cost: 307,240 $ (headline result)
- Plm license cost per user cost per unit: 2,560 $ / piece
- Variable plm license cost per user cost: 282,240 $
- Fixed plm license cost per user adder: 25,000 $
Run it with your numbers
- Every input above is editable in the live PLM License Cost per User calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.