Product Data Cleanup Cost at 47% records needing rework: a worked example
This worked example runs the product data cleanup cost numbers for a tougher week than the baseline: 47% records needing rework instead of the typical 65%. Estimate the cost of remediating product data from record count, per-record effort, and the share needing rework.
The inputs for this scenario
- Part records to clean: 12,000 records (held at the documented default)
- Cost per record cleaned: 1.8 $ / record (held at the documented default)
- Records needing rework: 47 % (the input this scenario stresses; the baseline uses 65)
- Tooling and rule setup cost: 9,500 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Product data cleanup cost = part records × cost per record × records needing rework + tooling and rule setup.
- Total product data cleanup cost works out to 19,652 $ at these inputs, and this is the headline figure for the scenario.
- Product data cleanup cost per unit works out to 1.64 $ / piece at these inputs.
- Variable product data cleanup cost works out to 10,152 $ at these inputs.
- Fixed product data cleanup cost adder works out to 9,500 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where records needing rework sits at 65% and the headline result is 23,540 $, this scenario comes in 16.52% below the baseline at 19,652 $.
- Use it when scoping a data-quality initiative, budgeting an ERP or PLM migration, or comparing in-house cleanup against an outsourced or automated approach. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total product data cleanup cost: 19,652 $ (headline result)
- Product data cleanup cost per unit: 1.64 $ / piece
- Variable product data cleanup cost: 10,152 $
- Fixed product data cleanup cost adder: 9,500 $