Port, Crane & Terminal Equipment worked example
Crane Weldment Cost at 69% full-penetration weld share: a worked example
What does the result look like when full-penetration weld share reaches 69%? The full calculation is worked below with real intermediate numbers. A fabrication estimator prices the boom girder weldment on a ship-to-shore crane before committing to a steel package quote.
The inputs for this scenario
- Weld Seam Length: 4,800 in (unchanged)
- Welding Cost per Inch: 6.5 $/in (unchanged)
- Full-Penetration Weld Share: 69 % (raised for this scenario; the documented default is 60)
- Fit-Up & Fixturing Charge: 8,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Weldment cost = seam length x cost per inch x full-penetration share% + fit-up/fixturing) to the inputs above produces each figure below.
- At this operating point the engine returns 29,528 $ for total crane weldment cost, the number this scenario is built around.
- At this operating point the engine returns 6.15 $ / piece for crane weldment cost per unit.
- At this operating point the engine returns 21,528 $ for variable crane weldment cost.
- At this operating point the engine returns 8,000 $ for fixed crane weldment cost adder.
How this compares with the baseline
- Against the tool's baseline example, where full-penetration weld share sits at 60% and the headline result is 26,720 $, this scenario comes in 10.51% above the baseline at 29,528 $.
- A figure at this level is achievable when full-penetration weld share is genuinely sustained, not just peaked for a shift. It applies one blended weld rate and one CJP share across the whole weldment; real crane structures mix fillet, partial-pen, and CJP welds at very different costs, so segment the estimate for high accuracy.
Results at a glance
- Total crane weldment cost: 29,528 $ (headline result)
- Crane weldment cost per unit: 6.15 $ / piece
- Variable crane weldment cost: 21,528 $
- Fixed crane weldment cost adder: 8,000 $
Run it with your numbers
- Every input above is editable in the live Crane Weldment Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.