Port, Crane & Terminal Equipment worked example
Spare Parts Buffer with daily critical spare consumption across the crane fleet of 3,000 units / day: a worked example in port, crane & terminal equipment
This scenario runs the spare parts buffer calculation on the strong side: daily critical spare consumption across the crane fleet of 3,000 units / day, with every other input held at its documented default. Use it when spare parts buffer in port, crane and terminal equipment is being sized for a buffer or safety stock review.
The inputs for this scenario
- Daily critical spare consumption across the crane fleet: 3,000 units / day (raised for this scenario; the documented default is 1,200)
- Supplier replenishment lead time for the spare: 85 days (unchanged)
- Safety stock multiplier for demand variability: 1.1 units (unchanged)
Working through the calculation
- Applying the documented formula (Spare parts buffer cycle stock = spare parts buffer daily usage × spare parts buffer lead time) to the inputs above produces each figure below.
- At this operating point the engine returns 32.09 days for protected days of supply, the number this scenario is built around.
- At this operating point the engine returns 35.29 days for unprotected days.
- At this operating point the engine returns 3,000 pieces for inventory.
- At this operating point the engine returns 85 pieces / day for daily usage.
How this compares with the baseline
- Against the tool's baseline example, where daily critical spare consumption across the crane fleet sits at 1,200 units / day and the headline result is 12.83 days, this scenario comes in 150% above the baseline at 32.09 days.
- Use it when setting or reviewing min/max reorder points for consumable and high-turnover crane spares where lead time is meaningful and demand is fairly steady. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Protected days of supply: 32.09 days (headline result)
- Unprotected days: 35.29 days
- Inventory: 3,000 pieces
- Daily usage: 85 pieces / day
Run it with your numbers
- Every input above is editable in the live Spare Parts Buffer calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.