Powder Metallurgy & Sintered Parts worked example
Infiltration Material Usage at 98% infiltration transfer efficiency: a worked example
What does the result look like when infiltration transfer efficiency reaches 98%? The full calculation is worked below with real intermediate numbers. Use it when infiltration material usage in powder metallurgy and sintered parts needs a buy quantity for the next powder metallurgy and sintered parts run and you do not want to short the line.
The inputs for this scenario
- Sintered parts to infiltrate: 500 units (unchanged)
- Infiltrant slug mass per part: 0.08 units (unchanged)
- Infiltration transfer efficiency: 98 % (raised for this scenario; the documented default is 85)
Working through the calculation
- Applying the documented formula (Required infiltration material usage = covered amount × use per unit ÷ transfer efficiency) to the inputs above produces each figure below.
- At this operating point the engine returns 40.82 units for required quantity, the number this scenario is built around.
- At this operating point the engine returns 40 units for theoretical amount.
- At this operating point the engine returns 0.82 units for loss allowance.
- At this operating point the engine returns 98 % for efficiency.
How this compares with the baseline
- Against the tool's baseline example, where infiltration transfer efficiency sits at 85% and the headline result is 47.06 units, this scenario comes in 13.27% below the baseline at 40.82 units.
- A figure at this level is achievable when infiltration transfer efficiency is genuinely sustained, not just peaked for a shift. It assumes one efficiency figure and does not account for part-to-part porosity scatter, so wide density variation across a batch will spread real usage around this estimate.
Results at a glance
- Required quantity: 40.82 units (headline result)
- Theoretical amount: 40 units
- Loss allowance: 0.82 units
- Efficiency: 98 %
Run it with your numbers
- Every input above is editable in the live Infiltration Material Usage calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.