Powder Metallurgy & Sintered Parts worked example
Inspection Cost at 92% sampling and inspection coverage: a worked example in powder metallurgy & sintered parts
Push sampling and inspection coverage up to 92% and the picture changes. This example computes every intermediate figure at that operating point. Use it when inspection cost in powder metallurgy and sintered parts is being put through a powder metallurgy and sintered parts weighted-cost review.
The inputs for this scenario
- Parts inspected per lot: 100 units (unchanged)
- Inspection labor & gauge cost per part: 45 $ / unit (unchanged)
- Sampling / inspection coverage: 92 % (raised for this scenario; the documented default is 80)
- Fixed metrology & setup cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Inspection Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where sampling and inspection coverage sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- It computes total lot inspection cost from a per-part gauging cost scaled by sampling coverage, plus a fixed metrology and setup charge. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $