Power Electronics, Motors & Drives worked example
Potting Material Usage with potting compound dispense rate of 6 units / hr: a worked example
This worked example runs the potting material usage numbers for a tougher week than the baseline: potting compound dispense rate of 6 units / hr instead of the typical 12 units / hr. Estimate potting or encapsulant consumption and cost for power modules, gate drivers, coils, sensors, converters, and motor electronics.
The inputs for this scenario
- Potting compound dispense rate: 6 units / hr (the input this scenario stresses; the baseline uses 12)
- Potting line runtime: 8 hr (held at the documented default)
- Potting compound cost: 3.5 $ / unit (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Potting material consumed = potting dispense or use rate × potting production runtime.
- Potting material run cost works out to 168 $ at these inputs, and this is the headline figure for the scenario.
- Potting material consumed works out to 48 units at these inputs.
- Potting production runtime works out to 8 hr at these inputs.
- Potting material cost works out to 3.5 $ / unit at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where potting compound dispense rate sits at 12 units / hr and the headline result is 336 $, this scenario comes in 50% below the baseline at 168 $.
- Use it to budget potting resin for a job, plan material reorders, or cost the encapsulation step of a drive or motor. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Potting material run cost: 168 $ (headline result)
- Potting material consumed: 48 units
- Potting production runtime: 8 hr
- Potting material cost: 3.5 $ / unit
Run it with your numbers
- To rerun this with your own numbers, open the live Potting Material Usage calculator, set potting compound dispense rate to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.