Printed Electronics & Flexible Hybrid Electronics worked example
Cost Per Flexible Circuit at 58% good-yield capture factor: a worked example
This worked example runs the cost per flexible circuit numbers for a tougher week than the baseline: 58% good-yield capture factor instead of the typical 80%. Cost per flexible circuit is the fully loaded unit cost of a printed or flexible hybrid electronic device once you fold variable print cost, yield capture, and amortized fixed tooling into one number.
The inputs for this scenario
- Flexible circuits produced: 100 units (held at the documented default)
- Variable print cost per circuit: 45 $ / unit (held at the documented default)
- Good-yield capture factor: 58 % (the input this scenario stresses; the baseline uses 80)
- Fixed tooling and setup cost: 250 $ (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Cost Per Flexible Circuit cost = quantity × rate × capture factor + fixed cost.
- Weighted cost works out to 2,860 $ at these inputs, and this is the headline figure for the scenario.
- Per piece value works out to 28.6 $ / piece at these inputs.
- Captured value works out to 2,610 $ at these inputs.
- Fixed adjustment works out to 250 $ at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where good-yield capture factor sits at 80% and the headline result is 3,850 $, this scenario comes in 25.71% below the baseline at 2,860 $.
- Use it when quoting a new flexible-circuit job, evaluating a volume break, or deciding whether tooling amortization justifies a run. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Weighted cost: 2,860 $ (headline result)
- Per piece value: 28.6 $ / piece
- Captured value: 2,610 $
- Fixed adjustment: 250 $
Run it with your numbers
- To rerun this with your own numbers, open the live Cost Per Flexible Circuit calculator, set good-yield capture factor to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.