Printed Electronics & Flexible Hybrid Electronics worked example
Rework Cost at 92% salvage capture factor: a worked example in printed electronics & flexible hybrid electronics
What does the result look like when salvage capture factor reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when rework cost in printed electronics and flexible hybrid electronics is being put through a printed electronics and flexible hybrid electronics weighted-cost review.
The inputs for this scenario
- Defective panels routed to rework: 100 units (unchanged)
- Loaded rework rate per panel: 45 $ / unit (unchanged)
- Salvage capture factor: 92 % (raised for this scenario; the documented default is 80)
- Rework setup fixed cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Rework Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where salvage capture factor sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when salvage capture factor is genuinely sustained, not just peaked for a shift. It uses a single blended rate and capture factor; a lot mixing easy solder-touch fixes with delicate printed-trace repairs will not be well described by one number.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Rework Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.