Production Ramp, Scale-Up & Launch Readiness worked example
Ramp Capacity Gap with capacity shortfall severity rating of 15 score: a worked example
What does the result look like when capacity shortfall severity rating reaches 15 score? The full calculation is worked below with real intermediate numbers. Use it when ramp capacity gap in production ramp, scale-up and launch readiness needs a defensible ranking against other production ramp, scale-up and launch readiness risks for the next review.
The inputs for this scenario
- Capacity shortfall severity rating: 15 score (raised for this scenario; the documented default is 6)
- Capacity shortfall occurrence likelihood: 4 score (unchanged)
- Capacity shortfall detectability rating: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Ramp capacity gap risk score = ramp capacity gap severity score × ramp capacity gap occurrence score × ramp capacity gap detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for ramp capacity gap risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for ramp capacity gap severity score.
- At this operating point the engine returns 4 score for ramp capacity gap occurrence score.
- At this operating point the engine returns 3 score for ramp capacity gap detection score.
How this compares with the baseline
- Against the tool's baseline example, where capacity shortfall severity rating sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- A figure at this level is achievable when capacity shortfall severity rating is genuinely sustained, not just peaked for a shift. It ranks risk, it does not size the gap — a high score tells you a constraint is dangerous but not how many units per hour you are short, so pair it with a capacity model.
Results at a glance
- Ramp capacity gap risk score: 8.15 score (headline result)
- Ramp capacity gap severity score: 15 score
- Ramp capacity gap occurrence score: 4 score
- Ramp capacity gap detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Ramp Capacity Gap calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.