Pultrusion & Continuous Composite Profiles worked example
Fiber Cost Per Foot at 92% fiber utilization: a worked example
What does the result look like when fiber utilization reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when fiber cost per foot in pultrusion and continuous composite profiles is being put through a pultrusion and continuous composite profiles weighted-cost review.
The inputs for this scenario
- Linear feet of profile pulled: 100 units (unchanged)
- Roving and mat cost per foot: 45 $ / unit (unchanged)
- Fiber utilization (net of scrap): 92 % (raised for this scenario; the documented default is 80)
- Creel setup and waste allowance: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Fiber Cost Per Foot cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where fiber utilization sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- A figure at this level is achievable when fiber utilization is genuinely sustained, not just peaked for a shift. It treats fiber utilization as a single blended factor; it does not separately account for reinforcement architecture differences (rovings vs. continuous strand mat vs. surfacing veil), which carry different unit costs and waste rates.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Fiber Cost Per Foot calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.