Pultrusion & Continuous Composite Profiles worked example

Quote Price at 92% realization factor: a worked example in pultrusion & continuous composite profiles

Push realization factor up to 92% and the picture changes. This example computes every intermediate figure at that operating point. Use it when quote price in pultrusion and continuous composite profiles is being put through a pultrusion and continuous composite profiles weighted-cost review.

The inputs for this scenario

  • Quoted linear units in the order: 100 units (unchanged)
  • Sell price per unit before adjustment: 45 $ / unit (unchanged)
  • Realization factor (net of discounts and yield loss): 92 % (raised for this scenario; the documented default is 80)
  • Fixed order charges (setup, tooling, freight): 250 $ (unchanged)

Working through the calculation

  • Applying the documented formula (Quote Price cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
  • At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
  • At this operating point the engine returns 43.9 $ / piece for per piece value.
  • At this operating point the engine returns 4,140 $ for captured value.
  • At this operating point the engine returns 250 $ for fixed adjustment.

How this compares with the baseline

  • Against the tool's baseline example, where realization factor sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
  • It computes the total quote for an order and the effective per-unit price by weighting unit sell price against a realization factor and adding fixed order charges. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Weighted cost: 4,390 $ (headline result)
  • Per piece value: 43.9 $ / piece
  • Captured value: 4,140 $
  • Fixed adjustment: 250 $

Run it with your numbers

  • Every input above is editable in the live Quote Price calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.