Pump, Compressor & Rotating Equipment Assembly worked example
Impeller Trim Effect at 65% line efficiency: a worked example
Suppose line efficiency falls to 65%. This page works the full calculation at that level so you can see exactly which result moves and by how much. This calculator converts completed pump output and runtime into an effective hourly throughput for an impeller-trim and final-assembly cell, after applying a line-efficiency factor.
The inputs for this scenario
- Units completed in the period: 1,200 units (held at the documented default)
- Assembly runtime: 8 hr (held at the documented default)
- Line efficiency: 65 % (the input this scenario stresses; the baseline uses 90)
Working through the calculation
- The calculation starts from the formula this tool documents: Raw impeller trim effect = completed output รท runtime.
- Effective throughput works out to 97.5 units at these inputs, and this is the headline figure for the scenario.
- Raw throughput works out to 150 units at these inputs.
- Efficiency works out to 65 % at these inputs.
- Runtime works out to 8 hr at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where line efficiency sits at 90% and the headline result is 135 units, this scenario comes in 27.78% below the baseline at 97.5 units.
- It computes raw throughput (units divided by runtime) and effective throughput (raw throughput derated by line efficiency). When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Effective throughput: 97.5 units (headline result)
- Raw throughput: 150 units
- Efficiency: 65 %
- Runtime: 8 hr
Run it with your numbers
- To rerun this with your own numbers, open the live Impeller Trim Effect calculator, set line efficiency to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.