Pump, Compressor & Rotating Equipment Assembly worked example
Parts Kitting Labor at 92% billable labor factor: a worked example in pump, compressor & rotating equipment assembly
This scenario runs the parts kitting labor calculation on the strong side: 92% billable labor factor, with every other input held at its documented default. Use it when parts kitting labor in pump, compressor and rotating equipment assembly is being put through a pump, compressor and rotating equipment assembly weighted-cost review.
The inputs for this scenario
- Kits assembled: 100 units (unchanged)
- Labor cost per kit: 45 $ / unit (unchanged)
- Billable labor factor: 92 % (raised for this scenario; the documented default is 80)
- Fixed kitting setup cost: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Parts Kitting Labor cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
- At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
- At this operating point the engine returns 43.9 $ / piece for per piece value.
- At this operating point the engine returns 4,140 $ for captured value.
- At this operating point the engine returns 250 $ for fixed adjustment.
How this compares with the baseline
- Against the tool's baseline example, where billable labor factor sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
- Use it to price a kitting run, compare in-house versus outsourced kitting, or roll kitting labor into a pump assembly's fully burdened cost. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Weighted cost: 4,390 $ (headline result)
- Per piece value: 43.9 $ / piece
- Captured value: 4,140 $
- Fixed adjustment: 250 $
Run it with your numbers
- Every input above is editable in the live Parts Kitting Labor calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.