Pump, Compressor & Rotating Equipment Assembly worked example

Run-In Energy Cost at 92% share of run-in time under full load: a worked example

What does the result look like when share of run-in time under full load reaches 92%? The full calculation is worked below with real intermediate numbers. Use it when run-in energy cost in pump, compressor and rotating equipment assembly is being put through a pump, compressor and rotating equipment assembly weighted-cost review.

The inputs for this scenario

  • Units put through run-in test: 100 units (unchanged)
  • Energy cost per unit run-in cycle: 45 $ / unit (unchanged)
  • Share of run-in time under full load: 92 % (raised for this scenario; the documented default is 80)
  • Fixed test-cell setup cost: 250 $ (unchanged)

Working through the calculation

  • Applying the documented formula (Run-In Energy Cost cost = quantity × rate × capture factor + fixed cost) to the inputs above produces each figure below.
  • At this operating point the engine returns 4,390 $ for weighted cost, the number this scenario is built around.
  • At this operating point the engine returns 43.9 $ / piece for per piece value.
  • At this operating point the engine returns 4,140 $ for captured value.
  • At this operating point the engine returns 250 $ for fixed adjustment.

How this compares with the baseline

  • Against the tool's baseline example, where share of run-in time under full load sits at 80% and the headline result is 3,850 $, this scenario comes in 14.03% above the baseline at 4,390 $.
  • A figure at this level is achievable when share of run-in time under full load is genuinely sustained, not just peaked for a shift. It treats the energy rate as flat — under time-of-use or demand tariffs the real bill can swing with when you run the cell.

Results at a glance

  • Weighted cost: 4,390 $ (headline result)
  • Per piece value: 43.9 $ / piece
  • Captured value: 4,140 $
  • Fixed adjustment: 250 $