Quality & Metrology worked example
Pp with tolerance width of 0.75 spec units: a worked example
This scenario runs the pp calculation on the strong side: tolerance width of 0.75 spec units, with every other input held at its documented default. Use it when you have long-term variation data and want overall process performance, not just short-term capability.
The inputs for this scenario
- Tolerance width (USL minus LSL): 0.75 spec units (raised for this scenario; the documented default is 0.3)
- Long-term process spread (6 sigma): 0.27 spec units (unchanged)
- Reporting conversion factor: 1 x (unchanged)
Working through the calculation
- Applying the documented formula (Pp = tolerance width รท long-term process spread) to the inputs above produces each figure below.
- At this operating point the engine returns 2.78 Pp for process performance pp, the number this scenario is built around.
- At this operating point the engine returns 2.78 value for raw ratio.
- At this operating point the engine returns 1 x for conversion factor.
- At this operating point the engine returns 0.27 value for long-term process spread (6 sigma).
How this compares with the baseline
- Against the tool's baseline example, where tolerance width sits at 0.3 spec units and the headline result is 1.11 Pp, this scenario comes in 150% above the baseline at 2.78 Pp.
- Use it for PPAP capability studies, long-term audits, and any time you have enough data to estimate the true overall standard deviation rather than a short-term within-subgroup one. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Process performance Pp: 2.78 Pp (headline result)
- Raw ratio: 2.78 value
- Conversion factor: 1 x
- Long-term process spread (6 sigma): 0.27 value
Run it with your numbers
- Every input above is editable in the live Pp calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.