Rare Earth Magnet & Motor Materials worked example
Quote Margin with quoted price per magnet order of 310 value: a worked example in rare earth magnet & motor materials
This scenario runs the quote margin calculation on the strong side: quoted price per magnet order of 310 value, with every other input held at its documented default. Use it when quote margin in rare earth magnet and motor materials needs a clean margin number for a rare earth magnet and motor materials go / no-go review.
The inputs for this scenario
- Quoted price per magnet order: 310 value (raised for this scenario; the documented default is 125)
- Fully loaded cost per magnet order: 100 value (unchanged)
- Reference base for the margin: 100 value (unchanged)
Working through the calculation
- Applying the documented formula (Quote margin amount gap = available quote margin amount - required quote margin amount) to the inputs above produces each figure below.
- At this operating point the engine returns 210 % for quote margin, the number this scenario is built around.
- At this operating point the engine returns 210 value for quote margin amount gap.
- At this operating point the engine returns 310 value for available quote margin amount.
- At this operating point the engine returns 100 value for required quote margin amount.
How this compares with the baseline
- Against the tool's baseline example, where quoted price per magnet order sits at 125 value and the headline result is 25 %, this scenario comes in 740% above the baseline at 210 %.
- Use it while pricing a magnet quote, comparing quote scenarios, or checking that a negotiated price still clears your margin floor. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Quote margin: 210 % (headline result)
- Quote margin amount gap: 210 value
- Available quote margin amount: 310 value
- Required quote margin amount: 100 value
Run it with your numbers
- Every input above is editable in the live Quote Margin calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.