Refractories, Furnace Linings & Foundry Consumables worked example
Castable Volume at 98% placement transfer efficiency: a worked example
This scenario runs the castable volume calculation on the strong side: 98% placement transfer efficiency, with every other input held at its documented default. Use it when castable volume in refractories, furnace linings and foundry consumables needs a buy quantity for the next refractories, furnace linings and foundry consumables run and you do not want to short the line.
The inputs for this scenario
- Lining surface area to be cast: 500 units (unchanged)
- Castable required per unit of area (installed thickness): 0.08 units (unchanged)
- Placement transfer efficiency (net of mixer and pump loss): 98 % (raised for this scenario; the documented default is 85)
Working through the calculation
- Applying the documented formula (Required castable volume = covered amount × use per unit ÷ transfer efficiency) to the inputs above produces each figure below.
- At this operating point the engine returns 40.82 gal for required quantity, the number this scenario is built around.
- At this operating point the engine returns 40 gal for theoretical amount.
- At this operating point the engine returns 0.82 gal for loss allowance.
- At this operating point the engine returns 98 % for efficiency.
How this compares with the baseline
- Against the tool's baseline example, where placement transfer efficiency sits at 85% and the headline result is 47.06 gal, this scenario comes in 13.27% below the baseline at 40.82 gal.
- Use it when ordering or batching castable, gunning mix, or plastic refractory for a lining, patch, or precast shape before a pour. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Required quantity: 40.82 gal (headline result)
- Theoretical amount: 40 gal
- Loss allowance: 0.82 gal
- Efficiency: 98 %
Run it with your numbers
- Every input above is editable in the live Castable Volume calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.