Renewable Energy, Solar & Wind Manufacturing worked example
Tower Fabrication Cost at 99% sound weld yield: a worked example
This scenario runs the tower fabrication cost calculation on the strong side: 99% sound weld yield, with every other input held at its documented default. A tower shop uses it to price a multi-section tubular tower order before committing rolling and welding capacity.
The inputs for this scenario
- Steel Plate Tonnage: 180 tons (unchanged)
- Fabrication Cost per Ton: 1,450 $/ton (unchanged)
- Sound Weld Yield: 99 % (raised for this scenario; the documented default is 96)
- Tooling and Setup Charge: 35,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total = plate tonnage x fab cost/ton x sound weld yield% + tooling charge) to the inputs above produces each figure below.
- At this operating point the engine returns 293,390 $ for total tower fabrication cost, the number this scenario is built around.
- At this operating point the engine returns 1,630 $ / piece for tower fabrication cost per unit.
- At this operating point the engine returns 258,390 $ for variable tower fabrication cost.
- At this operating point the engine returns 35,000 $ for fixed tower fabrication cost adder.
How this compares with the baseline
- Against the tool's baseline example, where sound weld yield sits at 96% and the headline result is 285,560 $, this scenario comes in 2.74% above the baseline at 293,390 $.
- Use it when quoting tower sections, setting weld-repair targets, or comparing a rolling or welding process change against yield. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total tower fabrication cost: 293,390 $ (headline result)
- Tower fabrication cost per unit: 1,630 $ / piece
- Variable tower fabrication cost: 258,390 $
- Fixed tower fabrication cost adder: 35,000 $
Run it with your numbers
- Every input above is editable in the live Tower Fabrication Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.