Reshoring & Tariff Strategy worked example
Supplier Switching Cost at 69% share requiring full requalification: a worked example in reshoring & tariff strategy
This scenario runs the supplier switching cost calculation on the strong side: 69% share requiring full requalification, with every other input held at its documented default. A commodity manager builds the business case for changing suppliers by sizing the full requalification and onboarding spend.
The inputs for this scenario
- Affected part numbers: 120 parts (unchanged)
- Switch cost per part: 850 $/part (unchanged)
- Share requiring full requalification: 69 % (raised for this scenario; the documented default is 60)
- Program-level transition cost: 40,000 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total switching cost ($) = affected parts x switch cost per part x requalification share% + program transition cost) to the inputs above produces each figure below.
- At this operating point the engine returns 110,380 $ for total supplier switching cost, the number this scenario is built around.
- At this operating point the engine returns 920 $ / piece for supplier switching cost per unit.
- At this operating point the engine returns 70,380 $ for variable supplier switching cost.
- At this operating point the engine returns 40,000 $ for fixed supplier switching cost adder.
How this compares with the baseline
- Against the tool's baseline example, where share requiring full requalification sits at 60% and the headline result is 101,200 $, this scenario comes in 9.07% above the baseline at 110,380 $.
- Use it when building the business case for re-sourcing parts to a new or regional supplier, especially under tariff or nearshoring pressure. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Total supplier switching cost: 110,380 $ (headline result)
- Supplier switching cost per unit: 920 $ / piece
- Variable supplier switching cost: 70,380 $
- Fixed supplier switching cost adder: 40,000 $
Run it with your numbers
- Every input above is editable in the live Supplier Switching Cost calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.