Robotics & Automation worked example
Robot Batch Capacity at 99% expected cell uptime: a worked example
Push expected cell uptime up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when committing to a batch size on a robot cell so the good parts the batch will actually produce is on one page, not the brochure number.
The inputs for this scenario
- Parts per robot cycle: 4 parts / cycle (unchanged)
- Cycles per batch window: 600 cycles (unchanged)
- Expected cell uptime: 99 % (raised for this scenario; the documented default is 88)
- Expected first-pass yield: 97 % (unchanged)
Working through the calculation
- Applying the documented formula (Gross batch capacity = parts per robot cycle x cycles per batch window) to the inputs above produces each figure below.
- At this operating point the engine returns 2,305 good parts / batch for good batch capacity, the number this scenario is built around.
- At this operating point the engine returns 2,400 good parts / batch for gross batch capacity.
- At this operating point the engine returns 24 good parts / batch for batch uptime loss.
- At this operating point the engine returns 71.28 good parts / batch for batch first-pass yield loss.
How this compares with the baseline
- Against the tool's baseline example, where expected cell uptime sits at 88% and the headline result is 2,049 good parts / batch, this scenario comes in 12.5% above the baseline at 2,305 good parts / batch.
- It computes good parts delivered per batch by multiplying parts-per-cycle and available cycles, then derating for cell uptime and first-pass yield. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Good batch capacity: 2,305 good parts / batch (headline result)
- Gross batch capacity: 2,400 good parts / batch
- Batch uptime loss: 24 good parts / batch
- Batch first-pass yield loss: 71.28 good parts / batch
Run it with your numbers
- Every input above is editable in the live Robot Batch Capacity calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.