Roofing, Siding & Exterior Building Products worked example
Coil Yield by Profile at 99% target coil yield rate: a worked example
This scenario runs the coil yield by profile calculation on the strong side: 99% target coil yield rate, with every other input held at its documented default. Use it when coil yield by profile in roofing, siding and exterior building products needs a clean rate and gap-to-target you can put on a tier board.
The inputs for this scenario
- Panels rejected for this profile: 8 count (unchanged)
- Total panels formed for this profile: 250 count (unchanged)
- Target coil yield rate: 99 % (raised for this scenario; the documented default is 95)
Working through the calculation
- Applying the documented formula (Coil yield by profile rate = coil yield by profile count ÷ total coil yield by profile population × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 3.2 % for coil yield by profile rate, the number this scenario is built around.
- At this operating point the engine returns 95.8 points for coil yield by profile gap to target.
- At this operating point the engine returns 8 count for coil yield by profile count.
- At this operating point the engine returns 250 count for total coil yield by profile population.
How this compares with the baseline
- Against the tool's baseline example, where target coil yield rate sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
- Use it per profile after a run or shift to rank which profiles scrap most and to feed a yield improvement backlog. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Coil yield by profile rate: 3.2 % (headline result)
- Coil yield by profile gap to target: 95.8 points
- Coil yield by profile count: 8 count
- Total coil yield by profile population: 250 count
Run it with your numbers
- Every input above is editable in the live Coil Yield by Profile calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.